Skip to main content
guest
Join
|
Help
|
Sign In
HotelGasifier2011
Home
guest
|
Join
|
Help
|
Sign In
HotelGasifier2011
Wiki Home
Recent Changes
Pages and Files
Members
home
Action Items and Progress List
ASPEN PLUS
Calculations
CO2 Capture
Chem. Production Specifications
Economics
Flow-sheets
Gasifier Reference
Mentor Notes
Pet Coke References
Poster
PowerPoint Presentations
Project Communications File
Report
Shell Gasifier Page
Syngas Cleaning
Timeline
Calculations
Edit
0
20
…
0
Tags
No tags
Notify
RSS
Backlinks
Source
Print
Export (PDF)
Calculations
EquipList and Sizing Calc.xlsx
Details
Download
44 KB
This spreadsheet has the equipment list and sizes, utility list including water and steam, electricity amount and catalyst amounts used.
energybalance 7.xlsx
Details
Download
83 KB
energybalance 7.xls
Details
Download
116 KB
(updated energy balance 03/07/11)
energybalance 6.xlsx
Details
Download
25 KB
(This energy balance still needs to be updated yet.But this is organized)
Energybalance (in '03 version).xls
Details
Download
99 KB
(This is duplicate file of the Energy Balance 6 saved in 2003 version)
OLD ( everything under this line is before 2/15/2011)
Starting Energy Balance (VP.xlsx
Details
Download
16 KB
This is Vejita's starting energy balance over the Hot WGS block. A final one that agrees with the Aspen will be provided later.
Complete and Balanced Streams Material Flow (TD).xlsx
Details
Download
64 KB
This is Tom's complete material balance over the entire process. This is a hand calculation in order to start up the Aspen, please look at the Aspen for more detailed streams.
Starting Material Balance ( VP).xlsx
Details
Download
17 KB
This is Vejita's starting the material balance in and outs of the gasifier.
Initial Process Sections (RK).xlsx
Details
Download
32 KB
This is Ryan's first draw out of some initial processes.
version 5: 02/11/11)
reference for the composition:
(
http://www-static.shell.com/static/globalsolutions/downloads/innovation/knowledge_centre/coal_gasification_process_for_us_industry.pdf
)
Javascript Required
You need to enable Javascript in your browser to edit pages.
help on how to format text
Turn off "Getting Started"
Home
...
Loading...
CalculationsThis spreadsheet has the equipment list and sizes, utility list including water and steam, electricity amount and catalyst amounts used.
(updated energy balance 03/07/11)
(This energy balance still needs to be updated yet.But this is organized)
(This is duplicate file of the Energy Balance 6 saved in 2003 version)
OLD ( everything under this line is before 2/15/2011)
This is Vejita's starting energy balance over the Hot WGS block. A final one that agrees with the Aspen will be provided later.
This is Tom's complete material balance over the entire process. This is a hand calculation in order to start up the Aspen, please look at the Aspen for more detailed streams.
This is Vejita's starting the material balance in and outs of the gasifier.
This is Ryan's first draw out of some initial processes.
version 5: 02/11/11)
reference for the composition:
(http://www-static.shell.com/static/globalsolutions/downloads/innovation/knowledge_centre/coal_gasification_process_for_us_industry.pdf)